Major Engineering Surveying Projects
Explore 2Spatial project experience across major rail, road, bridge, water and civil infrastructure projects in Victoria & Queensland.
Major infrastructure experience
2Spatial’s project portfolio demonstrates the combination of field surveying, survey management, digital engineering and spatial technology that underpins the business. The following case studies combine published 2Survey project information with current 2Spatial project information supplied for this rebrand.
BIFT — John Holland | CURRENT / IN PROGRESS

Approx. project value: $1 billion | Client: John Holland | Status: In progress
BIFT is positioned as a flagship current 2Spatial project. 2Spatial is self-performing the surveying function and providing ongoing engineering survey and digital support across the works. The project provides a strong example of the new 2Spatial brand in practice: field delivery, project control, digital data and modern spatial technology operating as one integrated service.
2Spatial scope
- Ongoing engineering and construction surveying
- Project control establishment, verification and maintenance
- Set-out and conformance across active work fronts
- As-built capture and QA support
- Survey data preparation and digital coordination
- Ongoing survey resourcing and project support
Technology & digital delivery
- Robotic total stations and GNSS
- 12d and digital engineering workflows
- Machine-control / construction data where required
- Laser scanning / point-cloud capture where appropriate
- UAV / aerial capture where approved and appropriate
- Integrated digital QA and as-built workflows
Project story
As a current project, the website should focus on the delivery model rather than claiming final outcomes before completion. The story is that 2Spatial is self-performing a major survey package on an approximately $1 billion John Holland project, using the company’s full survey and digital capability to support accurate, efficient construction as the project progresses.
Waurn Ponds Upgrade — Djilang Alliance

Published project value: $700 million | Victoria
The survey team delivered engineering surveying across critical phases of the Waurn Ponds Upgrade, including high-precision control and intensive support through a 78-day rail occupation. Survey coverage supported major structural installation works, including bridge components constructed offline and lifted into position.
2Spatial scope
- High-precision control across the corridor
- 24/7 survey coverage during the occupation
- Set-out and verification for structural and civil components
- Support for critical bridge lifting and installation
- As-built capture and construction verification
Technology & digital delivery
- Robotic total-station workflows
- GNSS and high-accuracy control
- Digital design-to-field data
- As-built and QA processing
Project story
The project demonstrates the ability to support time-critical rail delivery where survey control, sequencing and immediate verification are essential to keeping occupation works moving.
Western Treatment Plant — BMD Constructions

Published project value: $350 million | Victoria
The survey team provided broad engineering survey support across construction set-out, project control, earthworks, drainage, structures, as-builts, volume reporting and digital construction data.
2Spatial scope
- Survey control establishment and maintenance
- Earthworks, drainage and structural set-out
- Volume calculations and quantity reporting
- As-built and conformance documentation
- Coordination across multiple construction crews
Technology & digital delivery
- 12d data preparation
- Digital terrain models
- Machine-guidance files
- Trimble-format workflows
- Model coordination and validation
Project story
This project shows how field surveying and digital data management can work together. Responsive model updates and controlled construction data helped crews work from current information while survey verification supported QA and conformance.
Mt Derrimut Road Level Crossing Removal — Western Program Alliance

Published project value: $280 million | Victoria
The team delivered engineering surveying from early works through construction and commissioning across complex rail, road and structural packages, including major bridge and viaduct elements.
2Spatial scope
- Primary and secondary control
- Structural set-out and QA
- Rail alignments, platforms, services and civil works
- Occupation support
- Detailed as-built and handover data
Technology & digital delivery
- Leica robotic total stations
- GPS/GNSS
- Scanning workflows
- 12d Model
- 12d Synergy
Project story
The published case study records major structures installed within required tolerances and successful as-built handover, demonstrating the value of integrated field surveying, digital validation and responsive site support.
Barwon Heads Road Upgrade — Stage 1 | BMD Constructions

Published project value: $200 million | Victoria
Survey delivery covered control, feature surveys, roadworks, drainage, services, structures, bridge works, retaining structures and earthwork embankments.
2Spatial scope
- Construction control and feature surveys
- Road, drainage and service set-out
- Bridge and structural survey support
- Retaining-wall and drainage interfaces
- Bulk and detailed earthworks
- Volume and conformance reporting
Technology & digital delivery
- Trimble workflows
- 12d Model
- Machine-control uploads
- Digital model validation
Project story
The project demonstrates integrated field and digital support across a major road upgrade, with survey input supporting staging, earthworks, structural works and final conformance.
Coomera Connector — Stage 1 | Acciona–Georgiou JV

Published project value: $2.26 billion | Queensland
2Survey was engaged to provide comprehensive engineering surveying services for Stage 1 of the Coomera Connector. The published scope covers multiple concurrent work zones and major road, bridge, retaining-wall and utility elements.
2Spatial scope
- Primary and secondary control across multiple work zones
- Road alignment, structure and utility set-out
- Bridge, retaining-wall and pavement support
- As-built surveys and design conformance
- Coordination with design, construction and QA teams
Technology & digital delivery
- 3D modelling and data validation
- Digital field workflows
- High-accuracy control and set-out technology
- QA and as-built data processing
Project story
The project demonstrates Queensland delivery at major-infrastructure scale, with survey teams supporting concurrent work fronts and complex bridge and civil elements under demanding programs.
Hope Island Station | Acciona–Georgiou JV

Published project value: $200 million | Queensland
The survey team supported Hope Island Station across initial set-out, structural works and detailed as-built capture in a high-traffic corridor with rail and road interfaces.
2Spatial scope
- Control establishment and maintenance
- Structural set-out for platforms and retaining walls
- Overhead infrastructure support
- As-built surveys for QA and compliance
- Earthworks and drainage support
Technology & digital delivery
- BIM-to-field integration
- Digital design coordination
- High-accuracy construction set-out
- As-built data capture
Project story
Tight tolerances and constrained interfaces required proactive planning and coordination. The project strengthens 2Spatial’s Gold Coast / Queensland credentials in transport infrastructure and station construction.
Coomera Connector — Stage 3
Queensland | Project experience / details to be confirmed for publication
2Spatial will include Coomera Connector Stage 3 as part of its Queensland project portfolio. This entry should be expanded once the exact package, client, value, dates and survey scope that can be publicly disclosed are confirmed.
2Spatial scope
- Engineering surveying support
- Construction set-out and verification
- Project control and QA
- As-built and digital delivery as applicable
Technology & digital delivery
- Robotic total stations and GNSS
- 12d / digital engineering workflows
- Machine-control, scanning or UAV technology where actually used
Project story
The final case study should tell a specific delivery story rather than repeat the Stage 1 content. Once scope is confirmed, focus on the particular work package, construction challenge, technology used and measurable contribution made by the 2Spatial team.